Change Domain Fundamentals

Fundamentals of the Change Domain RL3

Levels of Change (PH3)

These are posted in detail in the Change Satellite.

This hierarchy was initially described in a minimal fashion in the Architecture Room, principally in the section dealing with Root Hierarchy projection to Primary Hierarchies. Some corrections have been made in the Satellite, but these did not alter general conclusions and conjectures developed there.

A Definitive Stage (PH3K)

The Tree for the Domain Vehicle was initially presented with minimal explanation in the section on Framework Naming.

Channels have since been proposed and posted in the Satellite.

The self-centred Tree is shown on the right with standard labelling.

Better viewing: Use browser zoom if needed.

Objective requirements for a definitive stage: Tree pattern. Self-centred requirements for a definitive stage: Tree pattern.

Changing Systems (PsH3)

This framework is provisionally formulated in order to gain conviction in regard to the Primary Hierarchy. It has not been posted or explained in the Satellite, which normally leads to amendments and refinements.

The first graphic shown below labels the Groups and Groupings. The second graphic proposes the qualities of the levels within the groups.

Requirements, components and states for "Changing Systems'' PsH3 Qualities of internal levels in each of the groupings used for "Changing Systems" (PsH3)

A Sustained Progression (PsH3K)

The Tree for the Domain Field is presented with minimal explanation in the section on Framework Naming. Channels have not yet been proposed.

The self-centred Tree is shown with standard labelling.

Better viewing: Use browser zoom if needed.

Requisite requirements for a sustained progression (PsH3K) Self-centred requirements for a sustained progression (PsH3K)



Originally posted: 22-Dec-2023. Amended: 30-May-2024.